10/20/23 Lookahead Update
Lookahead
- Building A Structural Steel 10/5/23 - 12/4/2023 (steel continues to go up, see image below)
- Building B Wood Frame 8/7/23 - 1/8/24 (Building B is partially framed up to the sixth floor. See image below for reference)
- Building C Siding & Trim 8/7/23 - 10/27/23 (garage façade continues to be installed)
- The final concrete pour for the garage was completed this week!