Big Picture Construction Update
Please see the below plan showing the planned delivery dates of each building on the Chelsea Innes project. As of now, the below timelines are accurate on when each building is planned to be completed.
- Building C (shaded in green): Spring 2024
- Building B (shaded in orange): Fall 2024
- Building A, Phase 3.1 (shaded in blue): Spring 2025
- Building A, Phase 3.2 (shaded in purple): Fall 2025